650-127 CGE Authorized Connected Grid Engineer Knowledge Verification

Exam Number 650-127
Duration 60 minutes (55-60 questions)
Available Languages English

This exam will test the knowledge of system engineers and field engineers regarding the features, functions, design, and planning for deployment of the Cisco Connected Grid technology solution. There will be a focus on the features and benefits of the Cisco 2010 Connected Grid Router (CGR 2010) and the Cisco 2500 Series Connected Grid Switch (CGS 2500). The solution deployment planning will include design, configuration, implementation, and integration.

Exam Topics
The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Introduction to Cisco Connected Grid Go-to-Market and Product Positioning
How to Sell
Cisco Connected Grid Ordering and Support
Cisco 2010 Connected Grid Router (CGR) Product Overview
Cisco 2500 Connected Grid Switch (CGS) Product Overview
Cisco Connected Grid Solutions


QUESTION 1
Which of the following models supports Power over Ethernet?

A. CGS-2520-24TC
B. CGS-2520-16S-8PC
C. All CGS models
D. None of the modelsupportsPOE

Answer: C

Explanation:


QUESTION 2
Which of the following is not a supported PDI Help Desk function?

A. design and configuration support
B. technical product question
C. implementation questions and support
D. On site support
E. RFP review

Answer: D

Explanation:


QUESTION 3
Which function is available on the Cisco Series 2500 Connected Grid Switch?

A. EnergyWise
B. inputs and outputs for alarms
C. GRWIC modules
D. StackWise

Answer: C

Explanation:


QUESTION 4
Which of these describes the overall vision of the Cisco Smart Grid?

A. Create a single infrastructure for Unified Communications from electrical generation plants to all
primary and secondary substations.
B. Integrate intelligent routing protocols into existing electrical grids.
C. Sell existing Cisco IP-based products to be used from end-to-end in our utility customer smart
grid deployments.
D. Design and architect an end-to-end communications infrastructure integrated with the power.

Answer: A

Explanation:


QUESTION 5
How many power supply slots are available on each Cisco CGR 2010 chassis?

A. 1 slot
B. 4 slots
C. 2 slots
D. No slots because all power is integrated over IP.

Answer: C

Explanation:

Click here to view complete Q&A of 650-127 exam
Certkingdom Review

MCTS Training, MCITP Trainnig

Best Cisco 650-127 Certification, Cisco 650-127 Training at certkingdom.com

Click to rate this post!
[Total: 0 Average: 0]

Leave a comment

(*) Required, Your email will not be published